Newly Built Three-Story House in Hiroshima's Saeki Ward
This newly built detached house, scheduled for completion in July 2026, is located in the Nishihara 1-chome area of Hiroshima City's Saeki Ward. The property offers a modern 3SLDK layout, with the 'S' denoting a service space that functions as a storage room. The total building area is 101.43 sqm (approximately 30.68 tsubo), situated on a land plot of 83.01 sqm (approximately 25.11 tsubo).
The house is designed with family living in mind. The living room is located on the second floor, which helps protect family privacy while ensuring good natural light and ventilation. A roughly 8-jo (tatami mat) storage room is equipped with a spacious closet. All rooms feature easy-to-clean flooring. Each Western-style room includes storage space, and there is a toilet on every floor. The kitchen is an open, island-style design. Parking is available, with space for up to two vehicles (depending on the car type).
The location provides a convenient living environment with amenities within walking distance. A supermarket is less than a 10-minute walk away, and the local elementary school is also within a 10-minute walk. The area is near a park, making it a child-friendly neighborhood. Access to public transport is provided by the Kabe Line's Shimo-Gion Station, which is a 10-minute walk from the property.
Special Notes/Remarks: The property is located within a land readjustment and construction regulation zone. (This may require applications for "permission" or other procedures to be submitted to the respective prefectural governor.)
The property is a wooden, three-story structure. The land is classified as residential land (宅地) with road frontage of approximately 4.2 meters on the west side (public road). The building-to-land ratio is 60% and the floor area ratio is 200% (however, this is restricted to 168% due to the width of the front road). The area is zoned as a Category I Exclusive Residential District (第一種住居地域) within a city planning urbanization area (市街化区域). The planned handover date is early August 2026 or later.