Spacious 4LDK Detached House in Yawata City, Kyoto
This well-maintained detached house in Yawata City, Kyoto Prefecture, offers a solid and robust exterior design that provides a sense of security and is built to last. The property features a generous 4LDK layout, providing ample living space. The exterior has been painted, and the well-kept appearance ensures a comfortable living environment. The dignified entrance imparts a feeling of reassurance and comfort to its residents.
The property is equipped with a system kitchen, a counter kitchen, an IH cooking hob, and a gas hob. The bathroom features a reheating function and a bath dryer. The separate washbasin with a shower is convenient for grooming and hair styling. Other indoor amenities include a walk-in closet, storage in all rooms, a TV monitor-equipped doorphone, and underfloor heating. The property is all-electric, barrier-free, south-facing, and comes with a parking space. Additional equipment includes public water supply, city gas, sewerage, a dedicated bath, a dedicated toilet, flooring, an independent washroom, storage in all rooms, a closet, a terrace, good views, and a high-roof parking space.
Located approximately a 23-minute walk from Yodo Station on the Keihan Main Line, the area offers convenient access. Within a 480-meter (approx. 6-minute walk) radius, there is a convenience store (Lawson Yodo Saiwaicho). Other nearby facilities include Super Iwaki Yodo Store (1,350m, 17 min walk), Food Net Mart Yodo Store (1,980m, 25 min walk), Kyoto Municipal Mazu Elementary School (1,190m, 15 min walk), and Kyoto Municipal Oyodo Junior High School (1,830m, 23 min walk).
The property has a renovation history. In July 2013, interior work was completed including wallpaper replacement for walls and ceilings in all rooms, floor replacement (flooring, etc.), replacement of fittings, sliding window glass and screen doors, installation of underfloor storage, window frames, and baseboards. The Japanese-style room had its tatami mats re-surfaced. The washroom had its walls, ceiling wallpaper, and floor CF replaced. The toilet and fittings were replaced. The entrance hallway had its walls and ceiling wallpaper replaced, flooring replaced, window frames and baseboards installed, and the entrance lock replaced. The south-facing Western-style room had its walls and ceiling wallpaper replaced, flooring replaced, window frames and baseboards installed, and partition fittings and storage fittings replaced. Other work included intercom replacement and antenna work. In December 2019, exterior wall painting was completed.