Newly Built 3SLDK House in Uruma, Okinawa
This newly constructed detached house in the Ezu area of Uruma City, Okinawa, offers a modern and spacious living environment. Currently under construction with a scheduled completion date of March 2026, this property features a 3SLDK layout, providing three bedrooms, a living room, dining room, and kitchen. The total building area is 95.63 square meters (28.92 tsubo) situated on a generous 133.05 square meter (40.24 tsubo) plot of land. The land is described as a regular-shaped, flat plot, ensuring ease of use and construction.
Key facilities and equipment include an indoor washing machine space. The property boasts a range of modern amenities such as a system kitchen with a counter, separate bath and toilet, unit bath, walk-in closet, under-floor storage, dimple key security, intercom, and a 24-hour ventilation system. It is equipped with propane gas, and features a garden. The construction is wood-frame with seismic isolation structure and comes with various certifications including a Long-term Excellent Housing evaluation, Housing Performance Evaluation, and Flat 35/S conformity certificate. A defect warranty is also provided.
According to the agent's notes, a deposit (earnest money) of approximately 300,000 to 1,000,000 yen from personal funds will be required separately at the time of contract. The agent, Amir Fudosan, emphasizes their supportive approach, stating they will assist according to the customer's situation to proceed without strain. They highlight that their company aims to be a place where customers can consult about anything freely. The explanation and guidance will be provided by a former sales representative from the Iida Group, the seller of this property, aiming to offer reassurance. The agent promises no pushy sales tactics. A special campaign is offered: a portion of the building purchase price (an amount decided through consultation) will be given as a cashback or a discount on the property price. They also offer introductions to cost-effective contractors for moving, optional construction work, floor coating, and more. The current status is under construction, and the building confirmation number is HPA-25-14835-1.