Renovated 4LDK Detached House in Shibata City, Niigata
This property is a detached house currently undergoing comprehensive renovation, with completion scheduled for June 2026. The house features a 4LDK layout with a total floor area of approximately 175.99 sqm. The renovation plan includes converting the kitchen to a face-to-face style, replacing all kitchen appliances, and installing a new unit bath from House Tech with automated bath functions. The toilet and washbasin vanity will also be replaced with new units. Throughout the house, wallpapers and flooring materials are being replaced.
The property includes a garage, and the renovation involves expanding the parking area. The garden space is being dismantled to create parking for three cars, and the garage shutter is being replaced. The first-floor Japanese-style room will have its tatami mats refaced and its fusuma and shoji sliding doors re-papered. The second-floor Japanese-style room is being converted into a Western-style room with ample storage and new closets. The balcony flooring will be repainted, and the polycarbonate sheets will be replaced. The entrance door will be replaced with a new one, and the interior entrance area, noted for its attractive Japanese-style design, will have its wallpaper replaced.
According to the agent's equipment notes, the property has city gas, public water supply, and a sewer drainage system. It is equipped with a shampoo dresser and a balcony.
The location is in Toyamachi 3-chome, Shibata City, Niigata Prefecture. Shibata Station on the Hakushin Line is approximately 1 km away, about a 13-minute walk, providing convenient daily commuting. The property fronts a municipal road approximately 5 meters wide, which receives snow removal services. The lot is a corner lot with road frontage on two sides. The property is in a flat, residential area within a low-rise exclusive residential zone. The lot size is 271.14 sqm. The house was built in January 1987 (40 years old) and is a wooden structure. It comes with a 5-year guarantee for termite control work. An open house is scheduled from April 16th to April 20th, 2026, by appointment.