Newly Built Apartment in Susenji, Fukuoka City
This newly constructed apartment, located on the third floor of a three-story wooden building in the Susenji 2-chome area of Nishi Ward, Fukuoka City, offers a modern living space. The property features a 1LDK layout with a dedicated floor area of 35.02 square meters, comprising a 3.6-tatami mat Western-style room and a 10.1-tatami mat living-dining-kitchen area. The unit is situated on a corner lot on the top floor, ensuring good natural light and privacy.
The apartment comes equipped with numerous amenities for comfortable living. These include a separate bathroom and toilet, a TV monitor intercom, an indoor washing machine space, air conditioning, a balcony, and a garbage disposal area within the premises. The kitchen features a gas stove, a system kitchen, and an opposing kitchen layout. The bathroom is equipped with a reheating function, a shower, and a bathroom dryer. A washstand with a vanity is provided, and the toilet is a warm-water bidet type. Flooring is throughout the main living areas. The building is equipped with an auto-lock system for security. Internet connection is available free of charge, with an initial setup fee of 5,500 yen.
Utility services include LP gas, which is noted for its quick recovery after disasters and strong heating power, though it tends to be more expensive than city gas. The property also has electric service, public water supply, and a sewer connection. The unit faces east.
Regarding rental terms, the monthly rent is 62,000 yen with a management fee of 4,000 yen. Key money is 62,000 yen. There is no deposit or guarantee fee listed. An agency fee of 55% of the monthly rent is required. A guarantee company is mandatory, with an initial payment of 60% of the total monthly payment and a monthly fee of 800 yen. Other initial costs include a cleaning fee of 55,000 yen and a disinfection/antibacterial fee of 17,600 yen. The lease term is a standard two-year contract. The property is currently under construction and is scheduled for completion in late August 2026.