New Construction Detached House in Ginowan City, Okinawa
This property is a new construction detached house currently under development in the Sasamashita area of Ginowan City, Okinawa. It is part of the "Ginowan City Sasamashita II A" subdivision and is being built to ZEH (Net Zero Energy House) standards, ensuring high energy efficiency. The house is a three-story reinforced concrete (RC) structure with a total floor area of 115.91 m² (approximately 35.06 tsubo) on a 70 m² (21.17 tsubo) plot of land. The land is described as flat terrain.
The layout is a 3LDK configuration, comprising three Western-style rooms and a combined living, dining, and kitchen area. The master bedroom is 7.3 tatami mats in size and features a large window and a spacious closet. The third floor houses two additional Western-style rooms of 4.9 and 5 tatami mats, ideal for children's rooms. A notable feature is the inclusion of a rooftop balcony. The property includes parking for two cars, though the listing notes that parallel parking two vehicles may be difficult depending on the car models.
Key facilities and equipment include a system kitchen with a gas cooktop (three or more burners), a dishwasher, a separate bath and toilet, a unit bath, two toilets, a bidet toilet seat, an intercom with a TV monitor, a dimple key entry system, and an indoor space for a washing machine. The house is equipped with a shoe closet, storage in all rooms, a 24-hour ventilation system, and propane gas. The property comes with a defect warranty from a government-specified corporation.
The location is convenient for daily life, with the "Daini Sasamashita" bus stop approximately a one-minute walk away. It is within a 10-minute walk to Kaganu Elementary School, a 4-minute walk to Kaganu Junior High School, and a 3-minute walk to Okinawa Catholic High School. Amenities such as supermarkets (San-A Food Kan Sasamashita Store and Kanehide Okinawa Kokusai University Mae Store) and a convenience store (FamilyMart Ginowan Maebaru 2-chome) are within a 5 to 10-minute walking distance. The listing includes a special note: as this is a direct transaction with the seller (the company listing the property), there will be no brokerage commission fees. The current status is "under construction" with a planned handover date in June 2026.