Blooming Garden Naha City Tsube 2-Chome 3-Building - Long-Term Excellent Housing
This new construction detached house development, 'Blooming Garden Naha City Tsube 2-Chome 3-Building', offers three distinct units designed as long-term excellent housing. Each unit features a spacious 3LDK layout, with total floor areas ranging from approximately 85.70 square meters to 91.91 square meters, built on land plots between 100.48 and 104.14 square meters. The property is conveniently located within an 18-minute walk from the Okinawa Urban Monorail's Tsubogawa Station, and a 12-minute bus ride from Asahibashi Station followed by a 3-minute walk from the 'Nokyo Kaikan-mae' bus stop.
Key property features include a large, easy-to-clean sink, a kitchen faucet with integrated water purifier, and a gas stove with storage. The kitchen also allows for filling the bathtub with hot water and reheating. The bathroom is equipped with a shower-equipped vanity, bath dryer, and bath heater. The property includes two or more toilets, featuring ultra-water-saving models (6L for large flush, 5L for small flush) with warm-water washing seats. Other notable amenities include a smart key system, a delivery box, and a TV monitor intercom. The energy-saving water heater contributes to the home's energy performance, which achieves a 30% reduction rate (4 stars). The insulation performance is rated 6 out of 7 levels.
According to the agent's notes, the road frontage consists of a 4.2-meter public road to the south and a 5.6-meter public road to the east. Utilities include public water supply, individual propane gas, main sewerage, and Okinawa Electric Power. A note clarifies that the car space, vehicle size, and position are conceptual images and may differ from the actual conditions.
The exterior and subdivision highlights include a terrace, available parking, completed ground survey, a corner lot, and a south-facing road. The building structure is a two-story wooden frame using conventional construction methods. The development is scheduled for completion in early May 2026, with handover possible from early June 2026. Each unit includes parking for two cars.