No. 33 Uruma City Maehara New Construction Detached House Building 2
This brand-new detached house in Uruma City, Okinawa, offers a modern and comfortable living space with a 4LDK layout. The property is currently under construction with a scheduled completion date of January 31, 2026, and immediate viewings are available. The house features a system kitchen with a counter, a water purifier, a dishwasher, and a monitor-equipped intercom. Additional amenities include a bathroom dryer, a separate washbasin and vanity, underfloor storage, and a propane gas system.
According to the agent's notes, the construction is wood frame and other materials. The property is built to Quasi-Fireproof Building Standards, and the tile roof significantly reduces maintenance costs. The house spans approximately 115.51 square meters (about 34.9 tsubo) across two stories, situated on a land area of approximately 146.66 square meters (about 44.4 tsubo). The layout includes a 16.5-jo combined living, dining, and kitchen area, a 5.16-jo Japanese-style room, and three Western-style rooms of 5.33, 6, and 7.5 jo. Two parking spaces are provided. The property is conveniently located just a one-minute walk from the Awaesen Eigyousho bus stop.