Newly Built Apartment in Fukuoka's Quiet Residential Area
This is a newly constructed apartment unit located on the second floor of a three-story wooden building in the quiet residential neighborhood of Minami-ku, Fukuoka City. The property offers a 1LDK layout with a living-dining-kitchen area of 8.5 tatami mats and a separate Western-style room of 4 tatami mats, totaling a floor area of 31.85 square meters. The unit faces southeast, allowing for good natural light throughout the day.
Key features include a separate bathroom and toilet, a TV monitor intercom, an indoor washing machine space, air conditioning, a corner room position, an auto-lock entrance system, a walk-in closet, an independent washbasin, a reheating function for the bath, and a balcony. The kitchen is equipped with a two-burner gas stove and is designed as an open, face-to-face layout. The property is connected to city gas, has a gas water heater, public water supply, and a sewage system. Additional amenities include a delivery box, a garbage disposal area within the premises, an entrance hall, an indoor drying rack, and a collective mailbox. The flooring is hardwood throughout.
The property is located within walking distance to multiple train stations: Sasabaru Station on the Kagoshima Main Line is 10 minutes away, Ijiri Station on the Nishitetsu Tenjin Omuta Line is 11 minutes away, and Ohashi Station on the same line is 28 minutes away. The address is 2-chome Ijiri, Minami-ku, Fukuoka City, Fukuoka Prefecture. A supermarket is located 900 meters from the property.
Rental terms include a monthly rent of 75,000 yen and a management fee of 3,000 yen. The key money is 75,000 yen. The brokerage fee is 55% of the monthly rent. A guarantor company is required, and the cost is 100% of the rent. The contract is for a standard two-year term, and the renewal fee is one month's rent. Initial move-in costs include a cleaning fee of 55,000 yen and a resident support fee of 22,000 yen. The property is available for foreign nationals. The building is currently under construction and is scheduled for completion in early November 2026.