Newly Built Single-Story Home in Omura City, Nagasaki
This property is a newly constructed single-story house located in Kuromaru-cho, Omura City, Nagasaki Prefecture. The building is a wooden structure with a total floor area of 93.57 square meters (approximately 28.30 tsubo) and sits on a land area of 220.47 square meters (approximately 66.69 tsubo). The layout is a 3LDK, featuring a 20-tatami mat LDK on the first floor, a main bedroom of 8 tatami mats, a Western-style room of 6 tatami mats, and another Western-style room of 4.5 tatami mats.
The property is equipped with a comprehensive range of modern fixtures and fittings. These include an air conditioner, an IH cooking heater, a water heater with energy-saving capabilities, and an all-electric system. The bathroom and toilet are separate, with the bathroom featuring a heated toilet seat, a dryer, a reheating function, and a bathroom heater. The washroom includes a shampoo dresser and a vanity with a three-way mirror. The kitchen is a system kitchen with a dishwasher and dryer, a water purifier, a dish dryer, and a pantry. The house has multiple lighting features such as motion sensor lights, downlights, and lighting fixtures in all rooms. Flooring is installed throughout all rooms, and the property benefits from dual-aspect lighting. Additional features include a garden, underfloor storage, storage spaces in all rooms, a shoe closet with a shoe IC, dimple keys, double lock keys, a card key, and a TV monitor intercom. The property also has a fire alarm.
The land is a rectangular plot with good sunlight exposure, and there is a distance of over 2 meters from adjacent buildings. The property offers two free parking spaces. The road frontage is on a private road to the north, with a width of 5 meters and a frontage of 11 meters. The water supply is from the public mains, and the property is connected to the public sewer system. As a special offer, the seller is providing a choice of three家电 (home appliances) as a gift, including a washing machine, refrigerator, 50-inch TV, or Dyson vacuum cleaner. The construction completion date is scheduled for July 2026.