New Build Detached House in Uruma, Okinawa
This newly constructed detached house, currently under construction and scheduled for completion in March 2026, offers a modern 2SLDK layout with a total floor area of 84.25m². The property sits on a flat 108.81m² plot of land, providing a stable and easily accessible foundation. The house is part of a development of 10 buildings, designated as Building F. Key features include a wooden structure with seismic isolation, long-term superior housing certification, and a design that meets Flat 35 S standards. The property comes with two parking spaces, a garden, and a balcony.
Equipment and facilities include an indoor washing machine space. The kitchen is equipped with a gas stove with three or more burners, a system kitchen, and a counter-style layout. The bathroom and toilet are separate, featuring a unit bath with a bathtub, shower, and dressing area, a separate washroom, reheat function, bathroom dryer, and bathroom heating. There are two toilets, both with warm-water washlet seats. Security features include an intercom and a TV phone with monitor. Storage is ample with a walk-in closet, shoe box, underfloor storage, and storage in all rooms. The property has city water and sewer, a 24-hour ventilation system, and propane gas.
Special notes from the agent clarify that at the time of contract, a separate deposit (earnest money) of personal funds (approximately 300,000 to 1,000,000 yen) will be required. The agent, Amir Real Estate, emphasizes their supportive and non-pushy approach, stating they aim to be a company where clients can consult about anything easily. The salesperson, formerly from the Iida Group (the seller of this property), provides explanations and guidance to help clients purchase with greater peace of mind. A campaign is also offered: part of the building purchase price (an amount decided through consultation) will be given as a cashback or a discount on the property price. The agent can also introduce cost-effective contractors for moving, optional construction work, floor coating, and more. The current status is under construction, and the building confirmation number is HPA-25-14839-1.
The property is located in the Ezu area of Uruma City, Okinawa Prefecture. This region offers a blend of suburban living with access to Okinawa's renowned coastal beauty. An interesting local fact is that Uruma City was formed from the merger of several towns and cities, and its name is a portmanteau of "Uruma" (an old name for Okinawa) and "uma" (horse), though its exact origin is debated. The closest major tourist attraction is the iconic Katsuren Castle, a UNESCO World Heritage site with stunning ocean views and rich Ryukyuan history.