Seibu Villa Naeba Building 5
This property is a 1LDK apartment located on the 8th floor of a 15-story reinforced concrete building in the Naeba area of Yuzawa Town, Niigata Prefecture. The unit offers a private area of 43.9 square meters with a 5.20 square meter southeast-facing balcony. The building was constructed in November 1980, making it 46 years old, and underwent major renovation work in 2010.
The apartment's equipment includes a storage-type electric water heater for hot water supply, an electric cooking stove, and a forced-air gas heater (FF type) for heating. Air conditioning is not currently installed but can be added subject to application and approval. A critical note is that the electric water heater is currently faulty.
Monthly fees include a management fee of 10,700 yen and a repair reserve fund of 2,800 yen, totaling 13,500 yen. Additional monthly costs include a basic water charge of 1,386 yen. Upon purchase, a one-time special reserve fund of 120,000 yen is required. Annual property taxes for the 2025 fiscal year are approximately 40,400 yen.
The building is a large-scale resort condominium complex with 440 units. Building amenities include a shared parking lot with 250 free spaces in front of Building 6, and a coin laundry with 10 washing machines and 8 dryers. The property is managed by Seibu Fudosan Property Management, with a front desk at the Building 6 management center operating 24/7 year-round. The location offers excellent access to ski resorts, being approximately a 13-minute walk to Naeba Ski Resort and about a 15-minute drive to the hot spring facility "Shukuba no Yu." The nearest major transport link is the Joetsu Shinkansen's Echigo-Yuzawa Station, approximately 21.6 km away (about a 33-minute drive). The property is for sale at a price of 330,000 yen, with a brokerage fee of 330,000 yen. The current condition is as a resort property, and the delivery timing is negotiable. Furniture and equipment are included in the sale. Viewings are available from April 22, 2026, onwards, with delivery possible from May 7, 2026.