Encrest Tenjin Port 302 - Urban Apartment in Hakata Ward, Fukuoka
This 1DK apartment on the 3rd floor of a 14-story reinforced concrete building offers a modern living space in the Chikkohonmachi area of Hakata Ward, Fukuoka City. The property is a condominium-type rental, featuring construction designed to reduce living noise and improve heating and cooling efficiency, including double-glazed windows and specialized flooring. Internet access is included at no additional cost to the tenant, with Wi-Fi provided, helping to reduce monthly running costs. The layout comprises a 7.9-tatami mat living/dining/kitchen area and a separate 2.3-tatami mat bedroom.
The apartment includes a range of built-in equipment: a system kitchen with a two-burner gas cooktop, a separate bathroom and toilet, a shower toilet seat with a heated seat, a bathroom with a drying function, an independent washbasin, a large shoe box, a closet, a washing machine space inside the unit, a balcony, and a TV monitor-equipped intercom with card key access. The building itself offers shared facilities including an elevator, auto-lock entrance, a dedicated garbage disposal area, a parcel delivery box, bicycle parking, security cameras, and a 24-hour security system. Utilities include city water and public sewer connection, with propane gas. The property is conveniently located within a three-minute walk of convenience stores and is a condominium-type rental.
Situated in Fukuoka City's Hakata Ward, the location provides access to both the vibrant city life and the calm of the nearby port area. The apartment is within walking or cycling distance of the Tenjin city center, offering a work-live proximity. It is approximately a 15-minute walk from Tenjin Station on the Fukuoka City Subway Airport Line and Nakasu-Kawabata Station on the same line. Other nearby stations include Gofukumachi Station on the Hakozaki Line and Nishitetsu Fukuoka Station on the Tenjin Omuta Line, each about a 17-minute walk away. The property is currently under construction with a planned completion date of June 2026, and occupancy is expected from early July 2026.