Riverside Kaizuka 2nd Floor Apartment
This apartment is located on the second floor of a two-story wooden building in the Hakamatsu 4-chome area of Higashi-ku, Fukuoka City, Fukuoka Prefecture. The property was built in December 2000 and offers a living space of 16.59 square meters. The layout is a 1R (one room) with a 6-tatami mat western-style room. The apartment faces east and features a loft that can be used for storage or as a relaxation space. Loft rooms typically have higher ceilings, making the room appear more spacious.
The apartment comes with a range of equipment including an air conditioner, flooring, a balcony, and a trash disposal area within the premises. The kitchen is equipped with a gas stove and a system kitchen. The bathroom and toilet are separate, and the unit includes a shower, a washbasin, and a toilet with a warm water bidet. A TV monitor intercom is installed for security. The apartment has an auto-lock system, a walk-in closet, a separate washbasin, a reheating function for the bath, and an indoor washing machine space. Parking is available on the premises. The property uses LP gas (propane gas), which offers quick recovery after disasters and strong heating power, though it tends to be more expensive than city gas. Utilities include electricity, public water supply, and sewage. Internet connection equipment is available, and the building supports terrestrial digital broadcasting. Storage includes a closet, a shoe box, and a loft.
The property is located a 5-minute walk from Kaizuka Station on the Fukuoka City Subway Hakozaki Line, a 15-minute walk from Hakozaki Station on the Kagoshima Main Line, and a 20-minute walk from Hakozaki-Kyudai-mae Station on the Fukuoka City Subway Hakozaki Line. The apartment is suitable for single occupants. Initial costs include a tenant support fee of 52,800 yen and a cleaning fee of 29,700 yen at contract. The agency fee is 55% of the monthly rent. A room cleaning fee of 44,000 yen is charged upon moving out. The property is currently undergoing renovation, scheduled for completion in mid-July 2026. The contract period is one year.