New Construction Detached House in Yokkaichi, Mie Prefecture
This is a newly built detached house located in Yokkaichi City, Mie Prefecture. The property is part of a two-building development, with this listing being for Building No. 1. It features a 4LDK layout with a total floor area of 104.33 square meters. The living, dining, and kitchen area is spacious at 18 tatami mats, and there is an additional 4.5-tatami mat Japanese-style room. All rooms are equipped with storage. The property includes parking for three cars side-by-side.
The house is equipped with a three-burner gas stove, a system kitchen with a counter, and a water purifier/activator. Bathroom features include a toilet with a warm-water bidet seat, a bathroom dryer, and bathroom heating. There are two or more toilets and an indoor laundry machine space. Additional features include underfloor storage, a walk-in closet, a shoe box, and insulated windows (double-glazed, inner windows, etc.). Security is provided by a TV monitor intercom, and the property uses propane gas.
The property is conveniently located within a 7-minute walk from the Kintetsu Nagoya Line's Umamichi Station. A FamilyMart convenience store is 250 meters away, and other nearby amenities include a drugstore (1,600m), a post office (900m), a bank (2,500m), an Aeon shopping mall (2,100m), and a park (1,600m). The local elementary and junior high schools, Yokkaichi City Shiohama Elementary School and Yokkaichi City Shiohama Junior High School, are 1,800 meters and 1,600 meters away, respectively.
According to agent notes, the current status is "unfinished." The agent encourages interested parties to feel free to inquire about desired viewing dates. Additional remarks note that the property is in a residential land development work regulation zone, a Law Article 22 zone, and the floor area ratio is subject to front road width restrictions.
The land size is 139.34 square meters (measured). The building is a two-story wooden structure. The property is scheduled for completion in March 2026, with handover expected in late April 2026.