Renovated 2LDK House in Kitami City, Hokkaido
This property is a single-story wooden house located at 4-7-62 Nakanoshima-cho, Kitami City, Hokkaido. It is a 2LDK layout with a building area of 79.52 sqm on a land area of 236.81 sqm. The property was built in December 1995 and is currently being renovated. The price includes consumption tax and renovation costs. The property is a vacant house, and viewings are possible even during renovation. The front road is a public road with a width of approximately 9.8 meters. The renovation includes: exterior wall painting, replacement of the system kitchen (LIXIL I-type W2550), replacement of the unit bath (LIXIL 1 tsubo type), toilet replacement (with shower function), replacement of the vanity, floor overlay, shoe box replacement, cross replacement, tatami mat replacement, water heater replacement, intercom installation, fire alarm installation, and lighting fixture replacement. The old floor heating panels in the living room will be removed, and new flooring will be laid. The 7.75 tatami mat Japanese-style room will be converted to a Western-style room with new flooring and closet. The 6 tatami mat Japanese-style room will have its tatami surface replaced and cross replaced. The entrance, storage, and living room storage will be cleaned and recrossed. The garage will be demolished. The property features a system kitchen, shower-equipped vanity, floor heating, all-electric system, barrier-free design, south-facing orientation, parking for two cars, a TV monitor intercom, a garden of over 10 sqm, double-glazed windows, and a flat parking space. The property is located about a 25-minute walk from Kitami Station on the JR Sekihoku Main Line. Nearby facilities include Minami Elementary School (1200m), Minami Junior High School (1500m), Super Center Trial Kitami Nakanoshima Store (550m), and Lawson Kitami Tokiwa Store (550m). The property is in a quiet residential area with low traffic volume. The property comes with a 2-year warranty for rain leaks, structural defects, and water pipe failures. New lighting fixtures will be installed.