New Construction Detached House in Chofu City, Tokyo
This is a newly built detached house scheduled for completion in August 2026, located in a quiet residential area of Chofu City, Tokyo. The property offers a 3LDK layout with a total floor area of 104.26 sqm (approximately 31.53 tsubo) on a land plot of 135.83 sqm (approximately 41.08 tsubo).
The building features a spacious living room of about 18.9 tatami mats, with a southwest orientation for good sunlight. All living rooms benefit from two-sided natural lighting. The layout includes a family-friendly face-to-face kitchen equipped with a built-in dishwasher to reduce household chores. A convenient pantry is located next to the kitchen. The house is equipped with a bathroom drying heater, useful for laundry on rainy days. There are toilets on both the first and second floors. The living/dining area features underfloor heating for warmth. The property includes ample storage with under-floor storage and a walk-in closet, among other spaces. A TV monitor intercom is installed for visitor convenience.
Access is available via bus from either JR Chuo Line's Mitaka Station (20 minutes by bus, then a 5-minute walk from Suwa Shrine stop) or Keio Line's Chofu Station (26 minutes by bus, then a 6-minute walk from Suwa Shrine stop). The neighborhood is family-friendly, with Chofu City Kitano-dai Elementary School about 700m away and Jindai Junior High School about 1860m away. A Seven-Eleven is approximately 480m away, and a Gyomu Supermarket is about 230m away. Shii-no-ki Park is roughly 120m from the property. The area is within a Category I Low-Rise Exclusive Residential Zone, ensuring a quiet living environment.
Special Notes/Remarks: Other / Legal Restrictions: Urban Regeneration Special Measures Act.
The property includes parking space for two cars (subject to vehicle type). The building is a wooden two-story structure. The land is classified as residential land, with road frontage of approximately 4m on the southeast side (public road). The building-to-land ratio is 40% and the floor area ratio is 80%. The planned handover date is late September 2026 or later.