Renovated Corner Unit with Private Garden in Chiba City
This 4LDK apartment is located on the first floor of a six-story reinforced concrete building in the Inage-ku area of Chiba City, Chiba Prefecture. The property offers a spacious floor plan with a total floor area of 94.98 square meters, complemented by a balcony of 3.6 square meters. A standout feature is the exclusive-use private garden of 44 square meters, available for a monthly fee of 660 yen, along with a terrace of 10.3 square meters at no additional charge. The unit is a corner apartment with a southwest-facing living room, ensuring ample natural light and good ventilation.
The apartment has undergone a renovation scheduled for completion in July 2026, which includes the replacement of kitchen, bathroom, and toilet fixtures, as well as interior refurbishment of walls and flooring throughout all rooms. All rooms feature hardwood flooring, making maintenance easy. The layout includes four bedrooms, a living-dining room, and a kitchen, with all bedrooms being six tatami mats or larger. The living-dining room is over 15 tatami mats in size and features a face-to-face kitchen with a dishwasher. Additional features include a system kitchen, storage in all rooms, a corner lot position, good sunlight exposure, a quiet residential area, a flat parking space, a heated toilet seat, a window in the bathroom, a delivery box, and an elevator. The property is pet-friendly upon consultation.
The property is located in the Sonno-cho area of Inage-ku, Chiba City. It is a 15-minute walk from the Anagawa Station on the Chiba Urban Monorail, and also accessible via a 10-minute bus ride from Inage Station on the JR Sobu Line, followed by a 5-minute walk. The immediate neighborhood includes a convenience store within a 7-minute walk, a drugstore within an 8-minute walk, and a supermarket within a 22-minute walk. The property is situated in a quiet residential area, and the first-floor corner unit minimizes noise from daily living. The building has a total of 103 units and was completed in February 2007.