Newly Built Brick Home in Kōnan City, Kōchi Prefecture
This is a newly constructed, two-story detached house located in the Noichi area of Kōnan City, Kōchi Prefecture. The property features a striking brick exterior that gives it a solid, premium appearance reminiscent of an overseas apartment building. The interior uses calming colors and materials to create a relaxed atmosphere. The property is situated outside of tsunami inundation zones and enjoys good sunlight exposure.
The home has a 3LDK layout with a total floor area of 99.36 square meters. On the first floor, there is 50.92 square meters of living space, and the second floor offers 48.44 square meters. The layout includes a 17.7-tatami-mat living, dining, and kitchen area, along with three Western-style rooms of 6.0, 5.0, and 4.5 tatami mats. The property includes a south-facing balcony and a terrace, as well as a garden. There are two toilets, both equipped with warm-water washing functions, with one being a tankless model. The bathroom is separate from the toilet and features a reheating function, an automatic bath, a shower, a bathroom dryer, and bathroom heating. The washroom includes a vanity with a shower. The kitchen is a system kitchen with an open layout, an IH cooking heater, a grill, and a dishwasher. Storage includes closets, a walk-in closet, and a shoe closet. The home is equipped with a 24-hour ventilation system, is internet-ready, and has indoor washing machine and drying space. Flooring is installed throughout all rooms, and the windows use double-glazed glass and high-sash frames. Lighting includes indirect lighting, motion-sensor lights, and downlights. A monitor-equipped intercom and security glass are also installed. The property uses propane gas, electricity, and town water, with a septic tank system. It features an energy-efficient water heater and is an all-electric home.
The property is located in a quiet residential area within a planned development zone. It is a 16-minute walk from the Noichi Station on the Tosa Kuroshio Railway. The property is currently vacant and ready for occupancy, with the move-in date negotiable. Construction is scheduled to be completed in February 2026.