Property Overview
This is a 4SLDK used detached house located in Horie 2-chome, Urayasu City, Chiba Prefecture. The property was built in March 2009 by former Panahome and features a lightweight steel frame construction over two storeys. The total floor area is 122.25 square meters, situated on a land area of 198.03 square meters. The layout includes a service space (S) used as a storage room. The property is located on a corner lot facing southwest and southeast, providing good sunlight exposure and ventilation. All rooms have windows. The living-dining-kitchen area is approximately 19.1 tatami mats in size, with floor heating installed in the LD area (approx. 15.6 tatami mats) and kitchen section. The kitchen is an open face-to-face type, enhancing the sense of space, and has an opening for ventilation. A study of approximately 1.9 tatami mats is located next to the kitchen. There is a Japanese-style room of approximately 6.4 tatami mats with Ryukyu tatami flooring and a clothes drying hook. On the second floor, there are three Western-style rooms, each with storage: one room of approx. 8.5 tatami mats has approx. 1.6 tatami mats of storage, and another of approx. 7.4 tatami mats has approx. 3.1 tatami mats of storage. The bathroom is equipped with a ventilation dryer and has an insulated floor. Toilets are located on both the first and second floors. The property has ample storage, including under-stair storage and under-floor storage. A counter is attached to the LD area. The property features a solar power generation system, a dishwasher, a TV monitor intercom, and a bathroom dryer. The front road width is 6 meters or more. The property is a corner lot with a south-west and south-east orientation. The land is zoned as Category 1 Residential District with a building coverage ratio of 60% and a floor area ratio of 200%. The property is located approximately a 13-minute walk from Urayasu Station on the Tokyo Metro Tozai Line. The surrounding area includes supermarkets, convenience stores, and a post office within walking distance. The property is currently occupied and scheduled for delivery from mid-January 2027.