Newly Built Detached House in Aisai City
This is a newly constructed, two-story wooden detached house located in the Fuchidaka-cho area of Aisai City, Aichi Prefecture. The property features a 4LDK layout with a total floor area of 98.54 square meters on a land plot of 106.07 square meters. It is a corner lot with road frontage on both the south (4.0m public road) and west (4.0m public road), and offers parking for two cars.
The property is equipped with public water supply, city gas, an individual combined septic tank, and electricity from Chubu Electric Power. The building confirmation number is R08SHC100853. Please note that this property is located within a 22-zone area and is subject to the Fill Land Regulation Act. For properties eligible for the Mirai Eco House program, an administrative fee of 99,000 yen (tax included) and a transfer fee will be deducted from the subsidy amount.
The house includes a range of modern fixtures and fittings. The kitchen features a counter kitchen with a dishwasher and a water purifier, along with a gas stove. Storage solutions include underfloor storage and a walk-in closet, with storage provided in all rooms. Bathroom amenities include a shower-equipped vanity, a warm water bidet toilet, a bathroom dryer and heater, and two toilets. The property also features double-glazed windows, a smart key entry system, an energy-efficient water heater, a TV monitor intercom, and a delivery box. The energy performance rating is three stars, achieving a 20% reduction rate, and the insulation performance is rated at level 5 out of 7.
The property is situated in Aisai City, which is in the western part of Aichi Prefecture. The nearest station is Fuchidaka Station on the Meitetsu Bisai Line, which is approximately a one-minute walk from the property. The area is served by Nishikawabata Elementary School (770m away), Saori Nishi Junior High School (1205m away), and Nishikawabata Nursery School (670m away). Nearby shopping options include Kanesue Heiwa Store (1091m away) and Yoshiya Heiwa Store (1054m away). The property is scheduled for completion in late June 2026, with handover possible from early July 2026.