Newly Built ZEH Home with Solar Power in Kochi City
This newly constructed detached house is located in Seto Higashimachi, Kochi City, Kochi Prefecture. The property is a ZEH (Net Zero Energy House) certified home, featuring a 5.280kW solar power generation system as standard equipment. The building is a two-story wooden structure with a total floor area of 88.33 square meters and sits on a 110.60 square meter plot. The layout is a 3LDK, offering three bedrooms, a living-dining-kitchen area, and two toilets, one on each floor.
The home is designed for energy efficiency and modern comfort. It features an all-electric system with an IH cooking stove, a dishwasher, a bathroom with a ventilation and heating dryer, and a water-saving, heated toilet seat. Low-E double-glazed windows are installed for superior insulation and heat reflection. The property also includes a walk-in closet in the master bedroom, a large mudroom (shoes closet), and a counter kitchen. An EV charging station is also available.
The property is situated on a corner lot with road frontage of 7.9 meters to the east and 4.9 meters to the north. Parking is available for up to three cars. The location offers convenient access to daily amenities, with a supermarket (Sunshine Via) just a 4-minute walk away, and Yokohama Elementary School a 9-minute walk from the home. The property is also near bus stops for the Tosaden Transport system.
According to the listing details, the property is sold by the developer, Green Energy Life Co., Ltd. The building confirmation number is Dai R08 Kakunin Kenchiku Kochi Ken Gijutsu 00139. A key feature is the option to purchase the home including the solar power generation system. The standard price includes a 'roof rental system' where the owner leases the roof to the company, and the solar system is transferred to the owner free of charge 10 years after power generation begins. Alternatively, the property can be purchased with the solar system included for an additional 1,000,000 yen, allowing the owner to retain all income from selling surplus electricity. The property is currently under construction with a scheduled completion date of October 2026.